This page was automatically translated and may contain errors. View in English.
T

Senior Project Engineer - Electrical Focus for Data Centre Construction

TGS International Group

Frankfurt, Hessen, Germany · 全职

抢先申请

经验
任何
薪水
EUR 60,000 – EUR 80,000 / year
职位空缺
1
发布
4天前
工作模式
在办公室
学历
Engineering degree or related qualification
恢复
需要申请

你的工作地点

职位描述

About the Role

We are partnered with a prominent mechanical and electrical (M&E) design and build firm known for managing large, intricate projects across Europe and the UK, especially in critical mission and data centre sectors. With growth accelerating in Germany, a skilled Senior Project Engineer is sought to support a key data centre project based in Frankfurt. This permanent full-time position offers a competitive salary between €60,000 and €80,000 alongside a living allowance, accommodation, and flights for a rotation schedule of 17 days on and 4 days off.

Key Responsibilities

  • Evaluating project designs, specifications, and precise technical requirements.
  • Overseeing technical submittals through complete review and approval stages.
  • Generating and managing Requests for Information (RFIs), maintaining accurate logs.
  • Collaborating closely with Project Managers, Design Teams, and Quantity Surveyors to monitor project milestones.
  • Ensuring site teams utilize the latest approved drawings and specifications.
  • Managing redline drawings and aligning as-built documentation with the design team.
  • Monitoring delivery timelines for long-lead equipment critical to the construction schedule.
  • Overseeing subcontractor performance and ensuring compliance with project standards.
  • Participating in site visits and project coordination meetings to streamline communication.
  • Assisting the commercial team with variation handling, change management, and procurement processes.
  • Maintaining adherence to all relevant building codes, technical standards, and environmental health and safety regulations.
  • Supporting commissioning activities, project handover, and creation of operations and maintenance (O&M) documentation.
  • Keeping meticulous project and document control records throughout the project lifecycle.

Candidate Profile

  • Demonstrated experience as a Project Engineer or Senior Project Engineer in mechanical and electrical construction projects.
  • Proven track record on large-scale and technically demanding projects, with preference for experience in data centre or mission-critical environments.
  • Strong expertise in M&E systems and construction execution.
  • Technical proficiency handling submittals, RFIs, drawings, and various project documentation.
  • Excellent coordination skills to bridge design, commercial, and site teams effectively.
  • Educational background in Engineering or related technical disciplines.
  • Proficient in MS Project and Microsoft Office; AutoCAD knowledge is an advantage.

如果您希望收到回复,请留下您的信息——我们不会将您的信息用于其他用途。

点击浏览拖放,或 粘贴 截图

PNG、JPG、GIF、MP4、WebM、MOV 格式 · 每个文件最大 20MB · 最多 5 个文件

🤖
在线·即时人工智能帮助